{"id":24588,"date":"2026-04-30T15:51:19","date_gmt":"2026-04-30T10:21:19","guid":{"rendered":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/"},"modified":"2026-04-30T15:51:19","modified_gmt":"2026-04-30T10:21:19","slug":"fix-governance-program-management-bottlenecks-planned-vs-actual-control","status":"publish","type":"post","link":"https:\/\/cataligent.in\/blog\/project-management\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/","title":{"rendered":"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control"},"content":{"rendered":"<h1>How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control<\/h1>\n<p>The most dangerous moment in any large-scale transformation is the Friday afternoon status meeting where reality is massaged to fit the projection. You hold a portfolio of high-value initiatives, but the variance between your planned-vs-actual control data has become a black box. When your governance program management bottlenecks prevent leadership from seeing the true financial impact, you are not managing a transformation; you are managing a narrative. This disconnect is the primary reason why strategic initiatives fail to deliver intended results.<\/p>\n<h2>The Real Problem<\/h2>\n<p>Most organizations treat variance reporting as a clerical burden rather than a diagnostic tool. The fundamental error lies in the belief that spreadsheets and slide decks constitute a governance system. In practice, this leads to disconnected trackers where project leads manipulate milestones to avoid the friction of formal escalation. Leaders often misunderstand that a green status in a report does not mean the project is on track; it often means the project lead is good at updating their own progress.<\/p>\n<p>Current approaches fail because they lack institutionalized stage-gate discipline. Without a hard-coded mechanism to prevent advancement until evidence of value is verified, governance becomes a rubber-stamping exercise. When data is siloed across different departments, the finance team remains blind to operational slippage until the end of the quarter, by which time the opportunity to recover the budget is lost.<\/p>\n<h2>What Good Actually Looks Like<\/h2>\n<p>Strong operators move away from subjective status reporting. Good governance is defined by a rigid cadence where the system, not the human, enforces the rules. Ownership is mapped to specific, measurable business outcomes. In a disciplined environment, it is impossible to move from &#8220;Implemented&#8221; to &#8220;Closed&#8221; without the explicit financial validation of the value created. This creates an environment where accountability is systemic rather than performance-review based. Visibility is not about seeing more data; it is about seeing the right data at the right time to make an informed decision on whether to kill, adjust, or accelerate an initiative.<\/p>\n<h2>How Execution Leaders Handle This<\/h2>\n<p>Successful transformation leaders implement a cross-functional control rhythm. They treat <a href=\"https:\/\/cataligent.in\/multi-project-management-solution\">multi-project management<\/a> as a financial engineering discipline. This requires a separation between execution progress and value potential\u2014the Dual Status View. By tracking the implementation status of a project separately from the realized financial impact, leadership can clearly identify when a project is &#8220;on time&#8221; but &#8220;underperforming&#8221; in terms of ROI. This prevents the common trap of celebrating activity while ignoring the lack of actual business impact.<\/p>\n<h2>Implementation Reality<\/h2>\n<h3>Key Challenges<\/h3>\n<p>The primary blocker is the cultural resistance to transparency. When project teams realize that their input is immediately visible to the CFO, they will push back. Organizations often struggle to transition from PowerPoint-led governance to system-led governance because it requires abandoning legacy reporting cycles.<\/p>\n<h3>What Teams Get Wrong<\/h3>\n<p>Teams frequently confuse activity tracking with outcome tracking. They invest heavily in tracking hours and task completion but fail to link those tasks to the specific measure package that drives the P&amp;L. This creates a mountain of data that offers zero clarity on whether the initiative will meet its goal.<\/p>\n<h3>Governance and Accountability Alignment<\/h3>\n<p>True governance requires hard stage gates. If an initiative fails to meet its predefined criteria at a milestone, the system must trigger an automatic hold status. This forces the steering committee to make a binary decision\u2014fix the variance or cancel the program\u2014thereby eliminating the &#8220;zombie project&#8221; phenomenon.<\/p>\n<h2>How Cataligent Fits<\/h2>\n<p>Fixing these bottlenecks requires a platform that enforces discipline by design. <a href=\"https:\/\/cataligent.in\/\">Cataligent<\/a> provides a configurable execution environment that replaces disparate spreadsheets with a structured governance system. Through the Degree of Implementation (DoI) framework, projects move through formal stage gates\u2014Defined, Identified, Detailed, Decided, Implemented, and Closed. Most importantly, with Controller Backed Closure, we ensure initiatives only reach the &#8220;Closed&#8221; state once the financial value is confirmed by the appropriate stakeholders. This level of rigor transforms the PMO from a reporting function into a strategic engine.<\/p>\n<h2>Conclusion<\/h2>\n<p>Governance is not a bureaucratic layer; it is the infrastructure for high-velocity decision making. By fixing your planned-vs-actual control, you stop managing documents and start managing outcomes. The bottleneck is rarely a lack of talent or effort; it is a lack of structural transparency. For leaders ready to move past manual reporting, the path forward is to institutionalize oversight through a platform that demands truth from every project. Stop measuring activity and start measuring the distance between your current position and your strategic goals.<\/p>\n<h5>Q: How can we reduce the time spent on board-ready reporting without sacrificing detail?<\/h5>\n<p>A: Shift from manual consolidation to automated, real-time reporting from your execution platform. By ensuring all projects follow a standardized data structure, you can generate board-ready status packs instantly without manual intervention.<\/p>\n<h5>Q: As a consulting principal, how do I ensure the client\u2019s internal team follows our delivery methodology?<\/h5>\n<p>A: Use a platform that embeds your methodology directly into the system workflows and stage gates. This forces adherence to your delivery model, as the project status cannot advance unless the required inputs and quality checks are completed.<\/p>\n<h5>Q: What is the biggest risk when migrating away from legacy spreadsheets?<\/h5>\n<p>A: The biggest risk is not the technical migration, but the cultural transition to transparency. Ensure you have clear executive backing to enforce new system-driven approval rules, as teams will resist moving away from the &#8220;flexibility&#8221; of unmonitored spreadsheets.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control The most dangerous moment in any large-scale transformation is the Friday afternoon status meeting where reality is massaged to fit the projection. You hold a portfolio of high-value initiatives, but the variance between your planned-vs-actual control data has become a black box. When your governance [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1616],"tags":[1748,1623,1664,2118],"class_list":["post-24588","post","type-post","status-publish","format-standard","hentry","category-project-management","tag-digital-project-management-and-collaboration-tools","tag-project-management","tag-project-management-excellence","tag-project-management-for-transformation"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control - Cataligent<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control - Cataligent\" \/>\n<meta property=\"og:description\" content=\"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control The most dangerous moment in any large-scale transformation is the Friday afternoon status meeting where reality is massaged to fit the projection. You hold a portfolio of high-value initiatives, but the variance between your planned-vs-actual control data has become a black box. When your governance [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/\" \/>\n<meta property=\"og:site_name\" content=\"Cataligent\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-30T10:21:19+00:00\" \/>\n<meta name=\"author\" content=\"cat_admin_usr\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@cataligentindia\" \/>\n<meta name=\"twitter:site\" content=\"@cataligentindia\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cat_admin_usr\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/\"},\"author\":{\"name\":\"cat_admin_usr\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/person\\\/649c37d6027e076e1e76bd18bac05756\"},\"headline\":\"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control\",\"datePublished\":\"2026-04-30T10:21:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/\"},\"wordCount\":912,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\"},\"keywords\":[\"Digital Project Management and Collaboration Tools\",\"Project management\",\"Project Management Excellence\",\"Project Management for Transformation\"],\"articleSection\":[\"Project Management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/\",\"name\":\"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control - Cataligent\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#website\"},\"datePublished\":\"2026-04-30T10:21:19+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\",\"name\":\"https:\\\/\\\/cataligent.in\\\/\",\"description\":\"Strategy Execution Tool for Cost Saving Program\",\"publisher\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\",\"name\":\"Cataligent Project Pvt. Ltd.\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/logoColored-1.png\",\"contentUrl\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/logoColored-1.png\",\"width\":296,\"height\":75,\"caption\":\"Cataligent Project Pvt. Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Cataligentstrategyimplementation\\\/\",\"https:\\\/\\\/x.com\\\/cataligentindia\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/cataligentstrategy\\\/\",\"https:\\\/\\\/www.instagram.com\\\/cataligentindia\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/person\\\/649c37d6027e076e1e76bd18bac05756\",\"name\":\"cat_admin_usr\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"caption\":\"cat_admin_usr\"},\"sameAs\":[\"https:\\\/\\\/cataligent.in\\\/blog\"],\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/author\\\/cat_admin_usr\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control - Cataligent","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/","og_locale":"en_US","og_type":"article","og_title":"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control - Cataligent","og_description":"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control The most dangerous moment in any large-scale transformation is the Friday afternoon status meeting where reality is massaged to fit the projection. You hold a portfolio of high-value initiatives, but the variance between your planned-vs-actual control data has become a black box. When your governance [&hellip;]","og_url":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/","og_site_name":"Cataligent","article_publisher":"https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/","article_published_time":"2026-04-30T10:21:19+00:00","author":"cat_admin_usr","twitter_card":"summary_large_image","twitter_creator":"@cataligentindia","twitter_site":"@cataligentindia","twitter_misc":{"Written by":"cat_admin_usr","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/#article","isPartOf":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/"},"author":{"name":"cat_admin_usr","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/person\/649c37d6027e076e1e76bd18bac05756"},"headline":"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control","datePublished":"2026-04-30T10:21:19+00:00","mainEntityOfPage":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/"},"wordCount":912,"commentCount":0,"publisher":{"@id":"https:\/\/cataligent.in\/blog\/#organization"},"keywords":["Digital Project Management and Collaboration Tools","Project management","Project Management Excellence","Project Management for Transformation"],"articleSection":["Project Management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/","url":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/","name":"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control - Cataligent","isPartOf":{"@id":"https:\/\/cataligent.in\/blog\/#website"},"datePublished":"2026-04-30T10:21:19+00:00","breadcrumb":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/fix-governance-program-management-bottlenecks-planned-vs-actual-control\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cataligent.in\/blog\/"},{"@type":"ListItem","position":2,"name":"How to Fix Governance Program Management Bottlenecks in Planned-vs-Actual Control"}]},{"@type":"WebSite","@id":"https:\/\/cataligent.in\/blog\/#website","url":"https:\/\/cataligent.in\/blog\/","name":"https:\/\/cataligent.in\/","description":"Strategy Execution Tool for Cost Saving Program","publisher":{"@id":"https:\/\/cataligent.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cataligent.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cataligent.in\/blog\/#organization","name":"Cataligent Project Pvt. Ltd.","url":"https:\/\/cataligent.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/cataligent.in\/blog\/wp-content\/uploads\/2025\/01\/logoColored-1.png","contentUrl":"https:\/\/cataligent.in\/blog\/wp-content\/uploads\/2025\/01\/logoColored-1.png","width":296,"height":75,"caption":"Cataligent Project Pvt. Ltd."},"image":{"@id":"https:\/\/cataligent.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/","https:\/\/x.com\/cataligentindia","https:\/\/www.linkedin.com\/company\/cataligentstrategy\/","https:\/\/www.instagram.com\/cataligentindia\/"]},{"@type":"Person","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/person\/649c37d6027e076e1e76bd18bac05756","name":"cat_admin_usr","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","caption":"cat_admin_usr"},"sameAs":["https:\/\/cataligent.in\/blog"],"url":"https:\/\/cataligent.in\/blog\/author\/cat_admin_usr\/"}]}},"_links":{"self":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts\/24588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/comments?post=24588"}],"version-history":[{"count":0,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts\/24588\/revisions"}],"wp:attachment":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/media?parent=24588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/categories?post=24588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/tags?post=24588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}