{"id":19823,"date":"2026-04-27T22:18:44","date_gmt":"2026-04-27T16:48:44","guid":{"rendered":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/"},"modified":"2026-06-17T06:18:57","modified_gmt":"2026-06-17T13:18:57","slug":"what-is-next-for-project-management-tools-and-software-in-phase-gate-governance","status":"publish","type":"post","link":"https:\/\/cataligent.in\/blog\/strategy-planning\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/","title":{"rendered":"What Is Next for Project Management Tools And Software in Phase-Gate Governance"},"content":{"rendered":"<h1>What Is Next for Project Management Tools And Software in Phase-Gate Governance<\/h1>\n<p>Project management tools and software are useful for schedules, tasks, and team coordination, but phase gate governance asks a harder question: should the work move forward, stop, change scope, or wait for evidence? Enterprise PMOs and consulting firms need tools that support decisions, not only activity tracking.<\/p>\n<p>The next step for project management is governed execution. Leaders need project data connected to value, approvals, readiness criteria, risk, dependencies, budget versus actuals, and formal closure. That is why phase gate governance belongs inside <a href=\"https:\/\/cataligent.in\/multi-project-management-solution\">multi project management<\/a> and transformation execution, not only inside task lists.<\/p>\n<h2>Why Traditional Project Tracking Is Not Enough for Phase Gates<\/h2>\n<p>A project can appear healthy because tasks are being completed, while the business case is weakening, the approval evidence is incomplete, or the expected financial value is slipping. A phase gate should expose that difference before leadership commits more time or money.<\/p>\n<p>In many organizations, the gate review is built manually. Project managers update task trackers, finance updates budgets, workstream owners update slides, and the PMO creates a steering committee pack. By the time the pack is ready, some data is already stale.<\/p>\n<p>Consulting firms experience the same issue in client programs. They may design a strong phase gate method, but the method loses force if evidence, approvals, and reporting sit outside the system used to manage the engagement.<\/p>\n<h2>What Phase Gate Governance Should Control<\/h2>\n<ul>\n<li>Project intake should define strategic fit, owner, sponsor, expected value, scope, and decision path.<\/li>\n<li>Gate readiness should require evidence such as detailed plan, approved budget, dependency review, risk response, and resource confirmation.<\/li>\n<li>Budget governance should compare plan, actuals, forecast, obligated spend, and variance by project or measure.<\/li>\n<li>Dependency tracking should show which project, function, supplier, or decision can block the next phase.<\/li>\n<li>Approval workflow should record who approved, what evidence was reviewed, and what conditions were attached.<\/li>\n<li>Closure should confirm whether the project delivered the expected business effect, not only whether tasks ended.<\/li>\n<\/ul>\n<h2>How Project Management Tools Should Evolve for Governance<\/h2>\n<p>The best direction is not to reject project management tools. It is to connect project control to a broader governance layer. Task completion matters, but it must be linked to phase decisions, value tracking, financial accountability, and executive reporting.<\/p>\n<p>This is especially important in <a href=\"https:\/\/cataligent.in\/business-transformation\">business transformation<\/a>, where a project rarely sits alone. A transformation program may include cost actions, operating model changes, IT workflows, policy updates, customer process changes, and leadership decisions. Each item may need a different gate, but all of them need one reporting cadence.<\/p>\n<p>For PMO leaders, this means project software should support portfolio views, milestone governance, approval gates, budget versus actual tracking, project closure, and value realization. For consulting teams, it should also support client access, reusable methodology, steering committee reporting, and board pack preparation.<\/p>\n<h2>Evaluation Questions for the Next Tool Review<\/h2>\n<ul>\n<li>Can the system separate task progress from gate readiness and value risk?<\/li>\n<li>Can leaders see which projects are blocked by missing approvals, finance validation, or dependency decisions?<\/li>\n<li>Can the PMO configure phase gates without needing development for every process change?<\/li>\n<li>Can the reporting view roll up from project level to portfolio, program, and organization level?<\/li>\n<li>Can formal closure include evidence, approval history, and value confirmation?<\/li>\n<\/ul>\n<h2>What Phase Gate Governance Adds Beyond Task Management<\/h2>\n<p>The next generation of project control is not about more task detail. It is about better decisions. Phase gate governance adds a management layer that asks whether the project is ready for the next commitment, whether value is still credible, and whether the right evidence has been reviewed.<\/p>\n<ul>\n<li>A project task list may show work completed, but the gate should show whether the business case still holds.<\/li>\n<li>A schedule may show milestone dates, but the gate should show whether dependencies and risks are under control.<\/li>\n<li>A budget view may show spending, but the gate should show whether forecast and actual value justify the next step.<\/li>\n<li>An approval note may show a decision, but the gate should show evidence, conditions, and accountability.<\/li>\n<\/ul>\n<p>This is why PMO leaders should evaluate tools by their ability to support decisions, not only collaboration. Phase gate control should make it easier to pause, cancel, approve, change, or close work with a clear audit trail.<\/p>\n<h2>A Practical Review Moment<\/h2>\n<p>In a gate review, the most valuable discussion is not whether the project manager updated the plan. It is whether the project is ready for the next decision. Leaders should review evidence, unresolved risks, dependency status, budget movement, expected value, and approval conditions. If a gate does not change the quality of decisions, it becomes another reporting ritual instead of a control mechanism.<\/p>\n<p>The final test is whether the next executive review can use the same facts that the execution team uses every week. If leaders see one version of owners, value, risks, approvals, and decisions, control improves. If leadership reporting depends on translation between files, the process is still too fragile for serious execution.<\/p>\n<h2>How Cataligent Helps Through CAT4<\/h2>\n<p>Cataligent helps PMOs, transformation offices, and consulting firms manage phase gate governance through CAT4, its no code strategy execution platform. CAT4 is not positioned as a generic task tracker; it supports the governed layer where projects, measures, approvals, financial impact, risks, dependencies, and reports are connected.<\/p>\n<ul>\n<li>CAT4 can configure phase gate logic using DoI stage gates from Defined to Closed.<\/li>\n<li>Implementation Status and Potential Status help leaders see whether project execution and expected value are moving together.<\/li>\n<li>Approval workflows, audit log, history management, and role based access help make gate decisions traceable.<\/li>\n<li>Portfolio, program, project, measure package, and measure hierarchy supports leadership reporting without manual consolidation.<\/li>\n<\/ul>\n<p>If your project management tools show activity but not decision readiness, Cataligent can help you design phase gate governance through CAT4. Ask for a project portfolio control review focused on gates, value tracking, approvals, risks, and formal closure.<\/p>\n<h2>FAQs<\/h2>\n<h3>Q: What should project management tools and software include for phase gate governance?<\/h3>\n<p>A: They should include gate criteria, evidence tracking, approval workflow, risk and dependency visibility, budget versus actuals, and formal closure rules. They should also help leaders separate task progress from value and decision readiness.<\/p>\n<h3>Q: Why do phase gate reviews fail in enterprise projects?<\/h3>\n<p>A: Phase gate reviews fail when evidence, approvals, financial data, and project status are stored in different places. The result is late escalation, manual reporting, and decisions based on incomplete or outdated information.<\/p>\n<h3>Q: How does Cataligent support phase gate governance through CAT4?<\/h3>\n<p>A: Cataligent helps organizations configure CAT4 around phase gates, approval workflows, project hierarchy, value tracking, and executive reporting. CAT4 supports DoI stage gates, Implementation Status, Potential Status, and controlled closure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What Is Next for Project Management Tools And Software in Phase-Gate Governance Project management tools and software are useful for schedules, tasks, and team coordination, but phase gate governance asks a harder question: should the work move forward, stop, change scope, or wait for evidence? Enterprise PMOs and consulting firms need tools that support decisions, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2104],"tags":[2033,568,632,1739,2107,1967,2106,2105],"class_list":["post-19823","post","type-post","status-publish","format-standard","hentry","category-strategy-planning","tag-business-strategy","tag-cost-reduction-strategies","tag-cost-reduction-strategy","tag-digital-strategy","tag-planning","tag-strategic-decision-making","tag-strategic-planning","tag-strategy-planning"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What Is Next for Project Management Tools And Software in Phase-Gate Governance - Cataligent<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Is Next for Project Management Tools And Software in Phase-Gate Governance - Cataligent\" \/>\n<meta property=\"og:description\" content=\"What Is Next for Project Management Tools And Software in Phase-Gate Governance Project management tools and software are useful for schedules, tasks, and team coordination, but phase gate governance asks a harder question: should the work move forward, stop, change scope, or wait for evidence? Enterprise PMOs and consulting firms need tools that support decisions, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/\" \/>\n<meta property=\"og:site_name\" content=\"Cataligent\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-27T16:48:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-17T13:18:57+00:00\" \/>\n<meta name=\"author\" content=\"cat_admin_usr\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@cataligentindia\" \/>\n<meta name=\"twitter:site\" content=\"@cataligentindia\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cat_admin_usr\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/\"},\"author\":{\"name\":\"cat_admin_usr\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/person\\\/649c37d6027e076e1e76bd18bac05756\"},\"headline\":\"What Is Next for Project Management Tools And Software in Phase-Gate Governance\",\"datePublished\":\"2026-04-27T16:48:44+00:00\",\"dateModified\":\"2026-06-17T13:18:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/\"},\"wordCount\":1119,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\"},\"keywords\":[\"Business Strategy\",\"Cost Reduction Strategies\",\"Cost Reduction Strategy\",\"Digital Strategy\",\"Planning\",\"Strategic Decision-Making\",\"Strategic Planning\",\"Strategy Planning\"],\"articleSection\":[\"Strategy Planning\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/\",\"name\":\"What Is Next for Project Management Tools And Software in Phase-Gate Governance - Cataligent\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#website\"},\"datePublished\":\"2026-04-27T16:48:44+00:00\",\"dateModified\":\"2026-06-17T13:18:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Is Next for Project Management Tools And Software in Phase-Gate Governance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\",\"name\":\"https:\\\/\\\/cataligent.in\\\/\",\"description\":\"Strategy Execution Tool for Cost Saving Program\",\"publisher\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\",\"name\":\"Cataligent Project Pvt. Ltd.\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/logoColored-1.png\",\"contentUrl\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/logoColored-1.png\",\"width\":296,\"height\":75,\"caption\":\"Cataligent Project Pvt. Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Cataligentstrategyimplementation\\\/\",\"https:\\\/\\\/x.com\\\/cataligentindia\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/cataligentstrategy\\\/\",\"https:\\\/\\\/www.instagram.com\\\/cataligentindia\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/person\\\/649c37d6027e076e1e76bd18bac05756\",\"name\":\"cat_admin_usr\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"caption\":\"cat_admin_usr\"},\"sameAs\":[\"https:\\\/\\\/cataligent.in\\\/blog\"],\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/author\\\/cat_admin_usr\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What Is Next for Project Management Tools And Software in Phase-Gate Governance - Cataligent","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/","og_locale":"en_US","og_type":"article","og_title":"What Is Next for Project Management Tools And Software in Phase-Gate Governance - Cataligent","og_description":"What Is Next for Project Management Tools And Software in Phase-Gate Governance Project management tools and software are useful for schedules, tasks, and team coordination, but phase gate governance asks a harder question: should the work move forward, stop, change scope, or wait for evidence? Enterprise PMOs and consulting firms need tools that support decisions, [&hellip;]","og_url":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/","og_site_name":"Cataligent","article_publisher":"https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/","article_published_time":"2026-04-27T16:48:44+00:00","article_modified_time":"2026-06-17T13:18:57+00:00","author":"cat_admin_usr","twitter_card":"summary_large_image","twitter_creator":"@cataligentindia","twitter_site":"@cataligentindia","twitter_misc":{"Written by":"cat_admin_usr","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/#article","isPartOf":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/"},"author":{"name":"cat_admin_usr","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/person\/649c37d6027e076e1e76bd18bac05756"},"headline":"What Is Next for Project Management Tools And Software in Phase-Gate Governance","datePublished":"2026-04-27T16:48:44+00:00","dateModified":"2026-06-17T13:18:57+00:00","mainEntityOfPage":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/"},"wordCount":1119,"commentCount":0,"publisher":{"@id":"https:\/\/cataligent.in\/blog\/#organization"},"keywords":["Business Strategy","Cost Reduction Strategies","Cost Reduction Strategy","Digital Strategy","Planning","Strategic Decision-Making","Strategic Planning","Strategy Planning"],"articleSection":["Strategy Planning"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/","url":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/","name":"What Is Next for Project Management Tools And Software in Phase-Gate Governance - Cataligent","isPartOf":{"@id":"https:\/\/cataligent.in\/blog\/#website"},"datePublished":"2026-04-27T16:48:44+00:00","dateModified":"2026-06-17T13:18:57+00:00","breadcrumb":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/what-is-next-for-project-management-tools-and-software-in-phase-gate-governance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cataligent.in\/blog\/"},{"@type":"ListItem","position":2,"name":"What Is Next for Project Management Tools And Software in Phase-Gate Governance"}]},{"@type":"WebSite","@id":"https:\/\/cataligent.in\/blog\/#website","url":"https:\/\/cataligent.in\/blog\/","name":"https:\/\/cataligent.in\/","description":"Strategy Execution Tool for Cost Saving Program","publisher":{"@id":"https:\/\/cataligent.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cataligent.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cataligent.in\/blog\/#organization","name":"Cataligent Project Pvt. Ltd.","url":"https:\/\/cataligent.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/cataligent.in\/blog\/wp-content\/uploads\/2025\/01\/logoColored-1.png","contentUrl":"https:\/\/cataligent.in\/blog\/wp-content\/uploads\/2025\/01\/logoColored-1.png","width":296,"height":75,"caption":"Cataligent Project Pvt. Ltd."},"image":{"@id":"https:\/\/cataligent.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/","https:\/\/x.com\/cataligentindia","https:\/\/www.linkedin.com\/company\/cataligentstrategy\/","https:\/\/www.instagram.com\/cataligentindia\/"]},{"@type":"Person","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/person\/649c37d6027e076e1e76bd18bac05756","name":"cat_admin_usr","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","caption":"cat_admin_usr"},"sameAs":["https:\/\/cataligent.in\/blog"],"url":"https:\/\/cataligent.in\/blog\/author\/cat_admin_usr\/"}]}},"_links":{"self":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts\/19823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/comments?post=19823"}],"version-history":[{"count":0,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts\/19823\/revisions"}],"wp:attachment":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/media?parent=19823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/categories?post=19823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/tags?post=19823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}