{"id":16433,"date":"2026-04-22T23:40:29","date_gmt":"2026-04-22T18:10:29","guid":{"rendered":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/"},"modified":"2026-06-17T06:13:04","modified_gmt":"2026-06-17T13:13:04","slug":"an-overview-of-project-kpis-for-pmo-and-portfolio-teams","status":"publish","type":"post","link":"https:\/\/cataligent.in\/blog\/strategy-planning\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/","title":{"rendered":"An Overview of Project KPIs for PMO and Portfolio Teams"},"content":{"rendered":"<h1>An Overview of Project KPIs for PMO and Portfolio Teams<\/h1>\n<p>Project KPIs help PMO and portfolio teams understand whether work is progressing, resources are being used well, risks are controlled, and business outcomes remain credible. The problem is that many KPI packs measure activity but fail to show whether projects are still valuable, approved, funded, and aligned with strategy.<\/p>\n<p>For enterprise PMOs and consulting firms, project KPIs should not become a reporting ritual. They should improve governance, escalation, prioritization, and executive decision making across the portfolio.<\/p>\n<h2>Why project KPIs need portfolio context<\/h2>\n<p>A single project can report schedule, budget, scope, quality, and risk. A portfolio team needs more. It needs to compare projects by business priority, resource demand, dependency exposure, financial impact, benefit risk, approval status, and strategic contribution.<\/p>\n<p>This changes the KPI discussion. A project may be on time but no longer strategically important. Another project may be delayed because it depends on a higher value initiative. A third may show strong task completion while budget, benefit, or adoption is slipping. PMO teams need KPIs that reveal these differences.<\/p>\n<p>Without portfolio context, project reporting often becomes a traffic light exercise. Green means activity is moving, amber means someone is concerned, and red means escalation is overdue. Better project KPIs help leaders see why the status exists and what decision is required.<\/p>\n<h2>Core project KPIs for PMO control<\/h2>\n<p>Schedule performance remains important, but it should be tracked with milestone quality, dependency status, and evidence of completion. A milestone marked complete without evidence can create false confidence.<\/p>\n<p>Budget versus actual is another core KPI. PMOs should track approved budget, committed cost, actual cost, forecast cost, and variance reason. For transformation and portfolio programs, financial tracking should also include benefits, not only cost.<\/p>\n<p>Risk exposure should show likelihood, impact, owner, mitigation plan, and escalation date. A list of risks is not enough. Leaders need to know which risks threaten schedule, value, customer impact, regulatory readiness, or resource capacity.<\/p>\n<p>Resource allocation should show capacity, critical skill availability, over allocated teams, and dependency on scarce roles. A project that looks green on dates may still be at risk if the same experts are committed to three priority programs.<\/p>\n<p>Benefit progress should show baseline, target, forecast, actual, and evidence where value claims are made. This KPI is especially important in <a href=\"https:\/\/cataligent.in\/business-transformation\">business transformation<\/a> and cost saving programs because task completion does not prove business impact.<\/p>\n<h2>Portfolio KPIs that executives should see<\/h2>\n<p>Portfolio leaders need KPIs that support trade off decisions. Useful examples include strategic alignment score, priority tier, funding status, approval gate status, dependency heat map, risk concentration, benefit at risk, projects pending decision, and projects ready for closure.<\/p>\n<p>A strong portfolio report should answer practical questions. Which projects should be accelerated? Which should be paused? Which projects are consuming resources without enough value? Which initiatives need sponsor intervention? Which business units are carrying the highest delivery risk?<\/p>\n<p>This is where <a href=\"https:\/\/cataligent.in\/multi-project-management-solution\">project portfolio management<\/a> needs a governed system. The PMO cannot manage a complex portfolio through disconnected trackers and slide based reporting if leaders expect current, comparable data.<\/p>\n<h2>Common mistakes in project KPI design<\/h2>\n<p>The first mistake is using too many KPIs. A PMO dashboard with 60 indicators often hides the few signals that matter. The better approach is to define a focused set for workstream teams, portfolio managers, and executives.<\/p>\n<p>The second mistake is treating RAG status as a KPI. Red, amber, and green can summarize status, but they need supporting evidence. A green project should still show whether budget, value, risks, dependencies, and approvals are under control.<\/p>\n<p>The third mistake is ignoring financial impact. A project that is on schedule but has lost its expected benefit should not be treated as fully healthy. PMO teams should separate implementation progress from value potential.<\/p>\n<p>The fourth mistake is weak ownership. Every KPI should have an owner, data source, reporting period, and decision use. If no one acts on a KPI, it is probably noise.<\/p>\n<h2>How to make project KPIs harder to game<\/h2>\n<p>PMO teams should design KPIs so status cannot be improved by optimistic wording alone. A milestone should require evidence, a budget variance should require a reason, a risk should require an owner, and a benefit claim should connect to a baseline and validation method. This makes reporting more useful and less dependent on subjective confidence.<\/p>\n<p>It also helps to separate leading and lagging indicators. Dependency aging, open decisions, resource conflicts, and approval delays are leading indicators because they warn the PMO before the project misses a target. Actual cost, benefit delivered, closure status, and customer impact are lagging indicators because they confirm what has already happened.<\/p>\n<p>PMO teams should also define who can change KPI status after a reporting period is reviewed. If historical status can be edited without control, trend reporting becomes unreliable. Reporting period locking, change history, and approval rules help preserve the integrity of the KPI pack and make executive reviews more credible.<\/p>\n<p>Finally, KPI ownership should be visible to the people who can act. A finance variance belongs with finance and the project owner, a resource conflict belongs with the portfolio manager and functional leader, and a decision delay belongs with the sponsor. Clear ownership turns KPI reporting into management action.<\/p>\n<h2>How Cataligent helps through CAT4<\/h2>\n<p>Cataligent helps PMO and portfolio teams improve KPI governance through CAT4, its no code strategy execution platform. CAT4 can structure work across Organization, Portfolio, Program, Project, Measure Package, and Measure levels so project KPIs roll up into portfolio and executive views.<\/p>\n<p>CAT4 supports planned versus actual tracking, implementation status, potential status, financial management, risks, dependencies, approval workflows, dashboards, and management ready reports. This helps PMO teams connect schedule, budget, risk, resource, and value KPIs in one governed platform.<\/p>\n<p>For consulting firms, Cataligent can help configure CAT4 around a reusable delivery method, KPI logic, reporting model, and client governance cadence. This reduces the need to rebuild reporting mechanics for each engagement and improves transparency for client leaders.<\/p>\n<h2>Turning KPIs into decisions<\/h2>\n<p>The purpose of project KPIs is not reporting volume. It is better decision making. A useful PMO KPI pack should tell leadership where to intervene, what to approve, what to stop, what to fund, what to escalate, and what value is still credible.<\/p>\n<p>If your PMO spends more time collecting KPI data than using it, the reporting model is not working. Cataligent can help teams use CAT4 to connect project KPIs with governance, financial impact tracking, approvals, and executive reporting.<\/p>\n<p>Need stronger PMO reporting? Speak with Cataligent about using CAT4 to build project and portfolio KPI views that support execution control and leadership decisions.<\/p>\n<h2>FAQs<\/h2>\n<h3>Q. Which project KPIs matter most for PMO teams?<\/h3>\n<p>The most useful KPIs usually cover schedule, budget, risk, dependencies, resource capacity, approval status, and benefit progress. PMO teams should choose KPIs that support decisions rather than tracking every available metric.<\/p>\n<h3>Q. Why should project KPIs include financial impact?<\/h3>\n<p>Projects are often approved because they are expected to create business value, reduce cost, improve service, or support strategy. Financial impact tracking helps leaders see whether the project still justifies its resources and attention.<\/p>\n<h3>Q. How does Cataligent support project KPI tracking through CAT4?<\/h3>\n<p>Cataligent helps configure CAT4 around portfolio hierarchy, KPI fields, reporting cadence, approval workflows, and executive views. CAT4 then provides one governed platform for tracking project KPIs from detailed measures to portfolio reporting.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An Overview of Project KPIs for PMO and Portfolio Teams Project KPIs help PMO and portfolio teams understand whether work is progressing, resources are being used well, risks are controlled, and business outcomes remain credible. The problem is that many KPI packs measure activity but fail to show whether projects are still valuable, approved, funded, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2104],"tags":[2033,568,632,1739,2107,1967,2106,2105],"class_list":["post-16433","post","type-post","status-publish","format-standard","hentry","category-strategy-planning","tag-business-strategy","tag-cost-reduction-strategies","tag-cost-reduction-strategy","tag-digital-strategy","tag-planning","tag-strategic-decision-making","tag-strategic-planning","tag-strategy-planning"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>An Overview of Project KPIs for PMO and Portfolio Teams - Cataligent<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"An Overview of Project KPIs for PMO and Portfolio Teams - Cataligent\" \/>\n<meta property=\"og:description\" content=\"An Overview of Project KPIs for PMO and Portfolio Teams Project KPIs help PMO and portfolio teams understand whether work is progressing, resources are being used well, risks are controlled, and business outcomes remain credible. The problem is that many KPI packs measure activity but fail to show whether projects are still valuable, approved, funded, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/\" \/>\n<meta property=\"og:site_name\" content=\"Cataligent\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-22T18:10:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-17T13:13:04+00:00\" \/>\n<meta name=\"author\" content=\"cat_admin_usr\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@cataligentindia\" \/>\n<meta name=\"twitter:site\" content=\"@cataligentindia\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cat_admin_usr\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/\"},\"author\":{\"name\":\"cat_admin_usr\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/person\\\/649c37d6027e076e1e76bd18bac05756\"},\"headline\":\"An Overview of Project KPIs for PMO and Portfolio Teams\",\"datePublished\":\"2026-04-22T18:10:29+00:00\",\"dateModified\":\"2026-06-17T13:13:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/\"},\"wordCount\":1234,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\"},\"keywords\":[\"Business Strategy\",\"Cost Reduction Strategies\",\"Cost Reduction Strategy\",\"Digital Strategy\",\"Planning\",\"Strategic Decision-Making\",\"Strategic Planning\",\"Strategy Planning\"],\"articleSection\":[\"Strategy Planning\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/\",\"name\":\"An Overview of Project KPIs for PMO and Portfolio Teams - Cataligent\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#website\"},\"datePublished\":\"2026-04-22T18:10:29+00:00\",\"dateModified\":\"2026-06-17T13:13:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/uncategorized\\\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"An Overview of Project KPIs for PMO and Portfolio Teams\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\",\"name\":\"https:\\\/\\\/cataligent.in\\\/\",\"description\":\"Strategy Execution Tool for Cost Saving Program\",\"publisher\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#organization\",\"name\":\"Cataligent Project Pvt. Ltd.\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/logoColored-1.png\",\"contentUrl\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/logoColored-1.png\",\"width\":296,\"height\":75,\"caption\":\"Cataligent Project Pvt. Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Cataligentstrategyimplementation\\\/\",\"https:\\\/\\\/x.com\\\/cataligentindia\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/cataligentstrategy\\\/\",\"https:\\\/\\\/www.instagram.com\\\/cataligentindia\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/#\\\/schema\\\/person\\\/649c37d6027e076e1e76bd18bac05756\",\"name\":\"cat_admin_usr\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g\",\"caption\":\"cat_admin_usr\"},\"sameAs\":[\"https:\\\/\\\/cataligent.in\\\/blog\"],\"url\":\"https:\\\/\\\/cataligent.in\\\/blog\\\/author\\\/cat_admin_usr\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"An Overview of Project KPIs for PMO and Portfolio Teams - Cataligent","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/","og_locale":"en_US","og_type":"article","og_title":"An Overview of Project KPIs for PMO and Portfolio Teams - Cataligent","og_description":"An Overview of Project KPIs for PMO and Portfolio Teams Project KPIs help PMO and portfolio teams understand whether work is progressing, resources are being used well, risks are controlled, and business outcomes remain credible. The problem is that many KPI packs measure activity but fail to show whether projects are still valuable, approved, funded, [&hellip;]","og_url":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/","og_site_name":"Cataligent","article_publisher":"https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/","article_published_time":"2026-04-22T18:10:29+00:00","article_modified_time":"2026-06-17T13:13:04+00:00","author":"cat_admin_usr","twitter_card":"summary_large_image","twitter_creator":"@cataligentindia","twitter_site":"@cataligentindia","twitter_misc":{"Written by":"cat_admin_usr","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/#article","isPartOf":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/"},"author":{"name":"cat_admin_usr","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/person\/649c37d6027e076e1e76bd18bac05756"},"headline":"An Overview of Project KPIs for PMO and Portfolio Teams","datePublished":"2026-04-22T18:10:29+00:00","dateModified":"2026-06-17T13:13:04+00:00","mainEntityOfPage":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/"},"wordCount":1234,"commentCount":0,"publisher":{"@id":"https:\/\/cataligent.in\/blog\/#organization"},"keywords":["Business Strategy","Cost Reduction Strategies","Cost Reduction Strategy","Digital Strategy","Planning","Strategic Decision-Making","Strategic Planning","Strategy Planning"],"articleSection":["Strategy Planning"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/","url":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/","name":"An Overview of Project KPIs for PMO and Portfolio Teams - Cataligent","isPartOf":{"@id":"https:\/\/cataligent.in\/blog\/#website"},"datePublished":"2026-04-22T18:10:29+00:00","dateModified":"2026-06-17T13:13:04+00:00","breadcrumb":{"@id":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/cataligent.in\/blog\/uncategorized\/an-overview-of-project-kpis-for-pmo-and-portfolio-teams\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cataligent.in\/blog\/"},{"@type":"ListItem","position":2,"name":"An Overview of Project KPIs for PMO and Portfolio Teams"}]},{"@type":"WebSite","@id":"https:\/\/cataligent.in\/blog\/#website","url":"https:\/\/cataligent.in\/blog\/","name":"https:\/\/cataligent.in\/","description":"Strategy Execution Tool for Cost Saving Program","publisher":{"@id":"https:\/\/cataligent.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cataligent.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cataligent.in\/blog\/#organization","name":"Cataligent Project Pvt. Ltd.","url":"https:\/\/cataligent.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/cataligent.in\/blog\/wp-content\/uploads\/2025\/01\/logoColored-1.png","contentUrl":"https:\/\/cataligent.in\/blog\/wp-content\/uploads\/2025\/01\/logoColored-1.png","width":296,"height":75,"caption":"Cataligent Project Pvt. Ltd."},"image":{"@id":"https:\/\/cataligent.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Cataligentstrategyimplementation\/","https:\/\/x.com\/cataligentindia","https:\/\/www.linkedin.com\/company\/cataligentstrategy\/","https:\/\/www.instagram.com\/cataligentindia\/"]},{"@type":"Person","@id":"https:\/\/cataligent.in\/blog\/#\/schema\/person\/649c37d6027e076e1e76bd18bac05756","name":"cat_admin_usr","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5a61f472589fc237202ca132bc60e152f3e6a99196f2e24dcf2a5f01626f1b4a?s=96&d=mm&r=g","caption":"cat_admin_usr"},"sameAs":["https:\/\/cataligent.in\/blog"],"url":"https:\/\/cataligent.in\/blog\/author\/cat_admin_usr\/"}]}},"_links":{"self":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts\/16433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/comments?post=16433"}],"version-history":[{"count":0,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/posts\/16433\/revisions"}],"wp:attachment":[{"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/media?parent=16433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/categories?post=16433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cataligent.in\/blog\/wp-json\/wp\/v2\/tags?post=16433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}